Dropped kerbs in Grimsby

Grimsby is on the streets of North East Lincolnshire Council, and that council decides on a dropped kerb (a vehicle crossover, also called kerb lowering). This is what North East Lincolnshire's own pages say.

Fee to apply
The council doesn't publish this
Who builds it
The council or an accredited contractor. The council (its highway agent EQUANS) can build it, or you can use a suitably qualified Streetworks accredited contractor under a Section 184 licence.
Typical total cost
The council doesn't publish this
Stated wait
Initial survey may take four to six weeks; written quotation within 14 days of the survey; installation currently up to six months after payment
Planning permission
On a principal (A) or classified (B or C) road planning permission must be obtained through the planning authority, and there is a charge for this. Planning consent may also be required in other cases.
Checked
11 October 2026 against North East Lincolnshire's own page

What it costs in Grimsby

North East Lincolnshire doesn't publish a fee to apply, and the council or a contractor it accredits builds it. Building the crossing is priced on top of the fee, once the council has looked at your pavement. Every council's fee is in the table of dropped kerb costs.

Apply to North East Lincolnshire

Start on North East Lincolnshire Council's dropped kerb page. Don't pay anyone to build it until the council has approved the application. Dropped kerbs in North East Lincolnshire has the council's other rules and every town it covers.

No room to park off the street?

A dropped kerb needs space in front of the house for the car. If you park on the street instead, a charging cable can cross the pavement in a channel where the council allows it. North East Lincolnshire: Coming Cross-pavement charging in North East Lincolnshire, or which of the two fits your house.