Dropped kerbs in Grimsby
Grimsby is on the streets of North East Lincolnshire Council, and that council decides on a dropped kerb (a vehicle crossover, also called kerb lowering). This is what North East Lincolnshire's own pages say.
- Fee to apply
- The council doesn't publish this
- Who builds it
- The council or an accredited contractor. The council (its highway agent EQUANS) can build it, or you can use a suitably qualified Streetworks accredited contractor under a Section 184 licence.
- Typical total cost
- The council doesn't publish this
- Stated wait
- Initial survey may take four to six weeks; written quotation within 14 days of the survey; installation currently up to six months after payment
- Planning permission
- On a principal (A) or classified (B or C) road planning permission must be obtained through the planning authority, and there is a charge for this. Planning consent may also be required in other cases.
- Checked
- 11 October 2026 against North East Lincolnshire's own page
What it costs in Grimsby
North East Lincolnshire doesn't publish a fee to apply, and the council or a contractor it accredits builds it. Building the crossing is priced on top of the fee, once the council has looked at your pavement. Every council's fee is in the table of dropped kerb costs.
Apply to North East Lincolnshire
Start on North East Lincolnshire Council's dropped kerb page. Don't pay anyone to build it until the council has approved the application. Dropped kerbs in North East Lincolnshire has the council's other rules and every town it covers.
No room to park off the street?
A dropped kerb needs space in front of the house for the car. If you park on the street instead, a charging cable can cross the pavement in a channel where the council allows it. North East Lincolnshire: Coming Cross-pavement charging in North East Lincolnshire, or which of the two fits your house.