Dropped kerbs in Ipswich

Ipswich is on the streets of Suffolk County Council, and that council decides on a dropped kerb (a vehicle crossover, also called kerb lowering), not the district council. This is what Suffolk's own pages say.

Fee to apply
£450 non-refundable application fee, covering a site visit to check the application against the criteria
Who builds it
A contractor the council accredits. You arrange an accredited contractor with street works qualifications and at least £5,000,000 public liability insurance to build it to the council's specification.
Typical total cost
The council doesn't publish this
Stated wait
The council responds within 20 working days after the site visit. Work must be finished within one year of the approval letter.
Planning permission
Planning permission from your district or borough council is needed first if the access leads onto an A, B or C road, is in a Conservation Area, affects a listed building, serves commercial premises, or includes more than 5 square metres of paving.
Checked
11 October 2026 against Suffolk's own page

What it costs in Ipswich

Suffolk charges £450 to apply, and a contractor the council accredits builds it. That is above the £228 average across the councils we've checked. Building the crossing is priced on top of the fee, once the council has looked at your pavement. Every council's fee is in the table of dropped kerb costs.

Apply to Suffolk

Start on Suffolk County Council's dropped kerb page. Don't pay anyone to build it until the council has approved the application. Dropped kerbs in Suffolk has the council's other rules and every town it covers.

Other places Suffolk covers

The same council and the same fee apply in Lowestoft.

No room to park off the street?

A dropped kerb needs space in front of the house for the car. If you park on the street instead, a charging cable can cross the pavement in a channel where the council allows it. Suffolk: Scheme open Cross-pavement charging in Suffolk, or which of the two fits your house.