Dropped kerbs in Wallsend

Wallsend is on the streets of North Tyneside Council, and that council decides on a dropped kerb (a vehicle crossover, also called kerb lowering). This is what North Tyneside's own pages say.

Fee to apply
The council doesn't publish this
Who builds it
The council or an accredited contractor. The Highways Operations Team is recommended first, but you may use a private contractor with public liability insurance and accreditation working to the council's specification.
Typical total cost
The council doesn't publish this
Stated wait
The Highways team aims to meet you on site within 10 working days; no build timescale given
Planning permission
Planning permission will normally be needed for a classified (A, B or C) road, a listed building, a conservation area with an Article 4 direction on hard surfacing, or where a protected tree is likely to be affected.
Checked
11 October 2026 against North Tyneside's own page

What it costs in Wallsend

North Tyneside doesn't publish a fee to apply, and the council or a contractor it accredits builds it. Building the crossing is priced on top of the fee, once the council has looked at your pavement. Every council's fee is in the table of dropped kerb costs.

Apply to North Tyneside

Start on North Tyneside Council's dropped kerb page. Don't pay anyone to build it until the council has approved the application. Dropped kerbs in North Tyneside has the council's other rules and every town it covers.

Other places North Tyneside covers

The same council and the same fee apply in Tynemouth.

No room to park off the street?

A dropped kerb needs space in front of the house for the car. If you park on the street instead, a charging cable can cross the pavement in a channel where the council allows it. North Tyneside: Coming Cross-pavement charging in North Tyneside, or which of the two fits your house.