Dropped kerbs in Cheshire West and Chester
Cheshire West and Chester Council is the highway authority for its streets, so it decides on a dropped kerb (a vehicle crossover, also called kerb lowering) and says who may build it. This is what its own pages say.
Towns and areas covered Barnton, Chester, Cuddington, Davenham, Ellesmere Port, Frodsham, Hartford, Helsby, Neston, Northwich, Weaverham, Winsford
- Fee to apply
- £139 non-refundable charge per application, covering assessment and administration
- Who builds it
- A contractor the council accredits. The works to install the dropped kerb are your responsibility; you give the council your contractor's insurance and streetworks accreditation certificates.
- Typical total cost
- The council doesn't publish this
- Stated wait
- A decision is issued in around five working days once the council has all the information
- Planning permission
- Planning permission is needed for A, B or C roads or trunk roads, if other works are not permitted development, or if the dropped kerb is the only work; otherwise it is not needed.
- Checked
- 11 October 2026 against Cheshire West and Chester's own page
What else Cheshire West and Chester asks
You need room for a vehicle to park wholly on your property (at least 4.8 m long and 2.4 m wide), 1.5 m from street lights and 10 m from a junction. After approval you get an application pack; follow it to avoid unexpected extra costs.
How Cheshire West and Chester's fee compares
At £139, Cheshire West and Chester's fee to apply is £89 less than the £228 average of the 114 councils that publish one. It is the joint 30th lowest of the 114.
The councils in the North West that we've checked, lowest fee first:
| Council | Fee to apply | Who builds it |
|---|---|---|
| Sefton | £50 | Council only |
| Trafford | £60.30 | Council or contractor |
| Tameside | £70 | Council or contractor |
| Bury | £85 | Council only |
| Wirral | £85 | Council or contractor |
| Liverpool | £100 | Council or contractor |
| Blackpool | £115 | Council or contractor |
| Cheshire West and Chester (this page) | £139 | Accredited contractor |
| Cheshire East | £170 | Accredited contractor |
| Oldham | £218 | Council only |
| Stockport | £220.48 | Not stated |
| Blackburn with Darwen | £250 | Not stated |
| Lancashire | £290 | Accredited contractor |
| Westmorland and Furness | £348 | Accredited contractor |
| Cumberland | £354.30 | Accredited contractor |
| Bolton | Not published | Council only |
| Halton | Not published | Not stated |
| Knowsley | Not published | Council or contractor |
| Manchester | Not published | Not stated |
| Rochdale | Not published | Council only |
| Salford | Not published | Accredited contractor |
| St Helens | Not published | Council or contractor |
| Warrington | Not published | Council or contractor |
| Wigan | Not published | Council only |
Apply to Cheshire West and Chester
Start on Cheshire West and Chester Council's dropped kerb page. Don't pay anyone to build it until the council has approved the application. Other councils' fees are in the table of every council.
No room to park off the street?
A dropped kerb needs space in front of the house for the car. If you park on the street instead, a charging cable can cross the pavement in a channel where the council allows it. Cheshire West and Chester: No scheme yet Cross-pavement charging in Cheshire West and Chester, or which of the two fits your house.
Towns and areas in Cheshire West and Chester
Cheshire West and Chester Council looks after the streets of Barnton, Chester, Cuddington, Davenham, Ellesmere Port, Frodsham, Hartford, Helsby, Neston, Northwich, Rudheath, Weaverham, Winsford.
The towns are the ONS's built-up areas, placed on the council whose streets they are on. A village that isn't named is looked after by the council whose area it is in: type your postcode into the checker if you're not sure which.