Dropped kerbs in Wigan

Wigan Council is the highway authority for its streets, so it decides on a dropped kerb (a vehicle crossover, also called kerb lowering) and says who may build it. This is what its own pages say.

Towns and areas covered Ashton-in-Makerfield, Aspull, Atherton, Golborne, Hindley, Ince-in-Makerfield, Leigh, Orrell, Platt Bridge and Abram, Shevington, Standish, Tyldesley

Fee to apply
The council doesn't publish this
Who builds it
The council only. Wigan Council constructs the crossing at its standard charges; you pay a deposit once the application is approved.
Typical total cost
Council worked example: £926.00 for a standard ramp with a 2.5 m gap between gate posts (£188.00 per metre of kerb adjusted over the gap plus 2 m, plus £80.00 administration). Crossing a grass verge adds more (example £1,952.00).
Stated wait
Decision within twenty working days of your application; the council will make every effort to build within ten weeks of receiving the deposit.
Planning permission
Planning permission is required for vehicle crossings on classified roads and must be obtained before the application process starts.
Checked
11 October 2026 against Wigan's own page and its fees list

What else Wigan asks

No fee to apply is stated; the £80.00 administration/supervision charge is part of the build price, with a further £80.00 cancellation fee in the standard charges. A service box (BT, Virgin etc) in the way adds an estimated £6,000, set by the provider. Council tenants need written permission from their estates manager first.

How Wigan's fee compares

Wigan doesn't publish a separate fee to apply, only the cost of the whole job given above. Across England the 114 councils that do publish one charge £228 on average.

The councils in the North West that we've checked, lowest fee first:

CouncilFee to applyWho builds it
Sefton£50Council only
Trafford£60.30Council or contractor
Tameside£70Council or contractor
Bury£85Council only
Wirral£85Council or contractor
Liverpool£100Council or contractor
Blackpool£115Council or contractor
Cheshire West and Chester£139Accredited contractor
Cheshire East£170Accredited contractor
Oldham£218Council only
Stockport£220.48Not stated
Blackburn with Darwen£250Not stated
Lancashire£290Accredited contractor
Westmorland and Furness£348Accredited contractor
Cumberland£354.30Accredited contractor
BoltonNot publishedCouncil only
HaltonNot publishedNot stated
KnowsleyNot publishedCouncil or contractor
ManchesterNot publishedNot stated
RochdaleNot publishedCouncil only
SalfordNot publishedAccredited contractor
St HelensNot publishedCouncil or contractor
WarringtonNot publishedCouncil or contractor
Wigan (this page)Not publishedCouncil only

Apply to Wigan

Start on Wigan Council's dropped kerb page. Don't pay anyone to build it until the council has approved the application. Other councils' fees are in the table of every council.

No room to park off the street?

A dropped kerb needs space in front of the house for the car. If you park on the street instead, a charging cable can cross the pavement in a channel where the council allows it. Wigan: Coming Cross-pavement charging in Wigan, or which of the two fits your house.

Towns and areas in Wigan

Wigan Council looks after the streets of Ashton-in-Makerfield, Aspull, Astley, Atherton, Golborne, Hindley, Ince-in-Makerfield, Leigh, Orrell, Platt Bridge and Abram, Shevington, Standish, Tyldesley.

The towns are the ONS's built-up areas, placed on the council whose streets they are on. A village that isn't named is looked after by the council whose area it is in: type your postcode into the checker if you're not sure which.